Page tree
Skip to end of metadata
Go to start of metadata

Overview

Equipment Details

Make: Smart Industries

On This Page

Associated Models

ToyChest31

Recommended Tools and Supplies

Installation

Install Mounting Hardware

Kit: M120-003 (Surface Mounting)

Part #: C-6801

Desc 1: F2 Reader Mounting Kit

Desc 2: Universal

   Qty: 1

  1. Place the C-6700-TEMP Drill Template on the desired mounting location.

  2. Verify included harnesses will reach desired location without encountering interference from internal machine components.

  3. Refer to F2 Reader Mounting Guide for further instructions.

Connect MDB Harness

Kit: T120-001 (MDB - Serial Communication and Power Harness)

Part #: C-6124-MDB

Desc 1: Machine Start Harness

Desc 2: F2 MDB Interface Harness

   Qty: 1

  1. Connect the male, 6-pin connector from the C-6124-MDB Machine Start Harness to the MDB connection on the Machine Control Assembly.
  2. If other payment devices are installed, connect the existing MDB harness to the female, 6-pin connector from the C-6124-MDB Machine Start Harness.

Connect and Mount Reader

  1. Feed remaining harness ends through the mounting hole.
  2. Connect the black connector of the C-6124-MDB Machine Start Harness to port 5 (Serial Connection Port) as shown in the image above.
  3. Connect the 3-pin connector of the C-6124-MDB Machine Start Harness to port 1 (Power Harness Connection Port) as shown in the image above.

CCI Software Configuration

Machine Control: MDB
 Pulse: *NOT SUPPORTED*
 Serial: Vending - MDB Level 1

Additional Resources

  • No labels